Lagos
London
New York
Dubai

Contact Info

  • ADDRESS: Omodunni Mansion, 13 Awujale St, Ijebu Ode 120101, Ogun State

  • PHONE: 08038708620
    09034533724

  • E-MAIL: info@skypenewsnaija.com.ng

  • Home  
  • Umahi Orders Three-Week Emergency Repairs of Major Federal Highways Nationwide
- Breaking News

Umahi Orders Three-Week Emergency Repairs of Major Federal Highways Nationwide

The Minister of Works, David Umahi, has directed an immediate three-week nationwide emergency rehabilitation of major federal highways to improve road conditions ahead of the festive season and the January 2027 general elections. The directive requires ministry officials and contractors to return to construction sites immediately to undertake urgent repairs and make critical sections of […]

The Minister of Works, David Umahi, has directed an immediate three-week nationwide emergency rehabilitation of major federal highways to improve road conditions ahead of the festive season and the January 2027 general elections.

The directive requires ministry officials and contractors to return to construction sites immediately to undertake urgent repairs and make critical sections of federal roads motorable.

According to a statement by his media aide, Francis Nwaze, Umahi issued the order on Friday during a meeting with Zonal Directors at the Federal Ministry of Works headquarters in Mabushi, Abuja.

The minister expressed displeasure with contractors concentrating on permanent construction on certain sections of highways while other portions of the same roads remained in deplorable and impassable conditions.

“This practice must stop. The people must not suffer on these roads,” he declared, directing that emergency rehabilitation should take precedence over permanent construction where necessary during the three-week exercise.

Umahi explained that the intervention would involve excavating failed sections of roads, replacing unsuitable materials with lumps and sharp sand, applying stone base mixed with 3.5 or five per cent cement where necessary, and finishing with asphalt binder and wearing courses where required.

He also ordered the rehabilitation of road shoulders and drainage systems, while directing that completed sections that had remained undisturbed for at least 21 days should be opened to traffic where considered safe.

The minister attributed the urgent intervention to the extensive deterioration of the country’s road network inherited by the President Bola Tinubu administration, noting that several major highways required attention simultaneously.

He said that, given the competing demands on available resources, durable emergency rehabilitation would help maintain road connectivity while permanent construction projects continued.

Umahi recalled that when Tinubu assumed office, motorists could hardly travel for 30 minutes without encountering potholes or severely damaged sections of highways.

He also cited improved security along the Abuja–Kaduna–Zaria Road, which he said was about 95 per cent completed, noting that no kidnapping incident had been reported along the route in the past two years.

The emergency rehabilitation programme covers major highways across the six geopolitical zones.

Among the roads listed for intervention are Sokoto–Zamfara, Funtua–Zaria, Kano–Katsina, Kano–Jigawa, Jigawa–Bauchi, Maiduguri Sections 4 and 5, Abuja–Lokoja, Mararaba–Keffi, Keffi–Makurdi, Makurdi–Nyieme, Lokoja–Benin, Benin–Ore, Benin–Asaba, Benin Bypass, Benin–Warri, Warri–Ughelli, the East-West Road and Okpanu–Calabar Road.

In the South-East, Umahi directed urgent intervention on the Enugu–Port Harcourt Road, particularly the Enugu–Aba section, as well as the Enugu–Abakaliki–Ogoja, Aba–Port Harcourt and Owerri–Onitsha highways.

The Bauchi–Gombe and Numan–Jalingo roads, alongside other critical routes in Adamawa and Taraba states, are also included in the rehabilitation exercise.

The minister further instructed contractors to revisit previously completed projects and rectify defective sections, warning that the expiration of the one-year defects liability period must not become an excuse for abandoning substandard work.

To ensure effective monitoring, he ordered the establishment of a dedicated digital reporting platform through which ministry officials would upload project locations, contractors’ details, completed work, outstanding interventions and challenges encountered.

Umahi stressed that his primary concern was the actual condition of the roads and the quality of work delivered, rather than contract sums or payments. He warned that contractors who failed to comply with the directives would be reported immediately for appropriate action.

On the Lagos–Calabar Coastal Highway, the minister reaffirmed the Federal Government’s commitment to completing the 750-kilometre project, dismissing suggestions that the reconstruction of the East-West Road could affect its implementation.

“Nothing happened to the 750-kilometre Lagos–Calabar Coastal Highway. The President has directed that the project must be completed as envisaged,” he said.

Umahi maintained that the East-West Road remained an additional national infrastructure priority and would not result in the abandonment or compromise of the Coastal Highway, which he described as the administration’s First Legacy Project.

“The President has directed that the Lagos–Calabar Coastal Highway remains intact and will be constructed and completed by the same administration that started it,” he added.

The minister expressed confidence in Tinubu’s commitment to delivering the administration’s infrastructure projects, including those he described as particularly challenging.

He also commended the President for prioritising road construction across the country, claiming that federal road projects were currently ongoing in every part of Nigeria.

Umahi said the three-week emergency intervention was designed to ease the difficulties faced by motorists, facilitate the movement of goods and services, support security operations and ensure the smooth transportation of people and election materials ahead of the January 2027 elections.

He urged ministry officials to approach the assignment with dedication, urgency and a strong sense of responsibility.

Leave a comment

Your email address will not be published. Required fields are marked *

SkyNewsNaija is a digital news platform committed to delivering timely news, reliable information, and insightful reporting on the events shaping Nigeria and the world.

Contact Us

 info@skypenewsnaija.com.ng

+234 803 870 8620

+234 903 453 3724

SkypenewsNaija@2026. All Rights Reserved.